环境治理项目规划与管理(英文版)

环境治理项目规划与管理(英文版)
作 者: 徐文英
出版社: 科学出版社
丛编项:
版权说明: 本书为出版图书,暂不支持在线阅读,请支持正版图书
标 签: 环境保护管理
ISBN 出版时间 包装 开本 页数 字数
未知 暂无 暂无 未知 0 暂无

作者简介

暂缺《环境治理项目规划与管理(英文版)》作者简介

内容简介

《环境治理项目规划与管理(英文版)》以环境治理项目规划与管理的过程为主线,吸收了国内外最新的环保项目管理的理论和方法,结合案例,完整地阐述了环保项目规划与管理的知识体系。全书共设14章、1个附录和3个案例。主要介绍了以下几个方面的内容:我国环保产业的驱动力、复杂性和特征,项目管理理论,环保项目的规划、追踪和控制,环保项目调研及可行性分析,环保项目的设计,环保项目的实施。《环境治理项目规划与管理(英文版)》可作为高等院校环境科学与工程专业的教材,也可作为环保项目管理工作者的学习和参考用书。

图书目录

Preface

Chapter 1 Introduction

 1.1 The environmental remediation industry in China

 1.2 Regulatory overview

 1.3 The changing market for remediation services

 1.4 Modem project management 

Chapter 2 Strategic Issues in Environmental Remediation

 2.1 Significant environmental statues

 2.1.1 The environmental protection law

 2.1.2 Regulations related to the \three wastes

 2.1.3 Other statues related to industrial waste management

 2.2 Fundamentals of environmental remediation

 2.2.1 The areas of potential project savings \'\

 2.2.2 The four phases of environmental contamination

 2.2.3 Factors that affect contaminant distribution and migration contaminant properties

 2.2.4 Environmental assessment, techniques, and advancements

 2.2.5 Remediation processes and advancements

 2.3 Complicating factors in environmental remediation

 2.3.1 Differing objectives of project stakeholders

 2.3.2 Charged political nature of environmental remediation projects

 2.3.3 Conflicting regulations

 2.3.4 Effect of complicating factors on remedy selection

 2.4 Scope management 

Chapter 3 General Project Management Concepts

 3.1 Environmental project management

 3.1.1 What is a project?

 3.1.2 Project management definition

 3.1.3 Environmental project management

 3.2 Project criteria

 3.3 Project management resources

 3.4 Project management functions

 3.4.1 Project integration management

 3.4.2 The four core functions (knowledge areas)

 3.4.3 Four facilitating functions

 3.5 Project management steps

 3.6 Project management functions and boundaries

 3.7 Project monitoring and controlling

 3.7.1 Project monitoring

 3.7.2 Project control

 3.8 Project life cycle

 3.8.1 Project phase activities

 3.8.2 Significance of the phases

 3.9 The environmental industry life cycle

 3.10 The project planning and control cycle

 3.11 General RPM responsibilities during RD/RA 

Chapter 4 Reviewing Request for Proposal

 4.1 Request for proposal

 4.2 Importance of a high-quality proposal

 4.3 Aproposal is a project

 4.4 Recommended proposal format

 4.5 Basis for the bid-no bid evaluation

 4.5.1 The bid-no bid evaluation process

 4.5.2 The proposal manager and team

 4.6 Summarizing data

 4.6.1 Categories of information

 4.6.2 Site visit/data gathering

 4.7 Identifying objectives

 4.8 Specifications

 4.8.1 Detailed design specifications

 4.8.2 Performance-based specifications

 4.9 Political, economical, and technological considerations

 4.10 Stakeholder analysis

 4.10.1 The.project stakeholder management process

 4.10.2 Identifying project stakeholders

 4.10.3 Identification of mission

 4.10.4 Predicting stakeholder strategy and behavior

 4.11 Initial risk identification

 4.11.1 Definition of project risk

 4.11.2 Project risk factors

 4.11.3 Risk management

 4.11.4 Contract strategy considerations

 4.11.5 Overall project risks 

Chapter 5 Assembling Project Teams

 5.1 Identifying key project personnel

 5.1.1 Skill sets required to perform tasks

 5.1.2 Typical project team

 5.1.3 Assembling a technical review team

 5.1.4 Availability of personnel

 5.1.5 Commitment and leadership

 5.2 Team planning and geographical distribution

 5.3 Project work plan completion/linear responsibility chart

 5.4 The project office and location 

Chapter 6 Developing a Work Breakdown Structure

 6.1 Definition of work breakdown structure

 6.2 Work breakdown structure formats

 6.2.1 Tree diagram format

 6.2.2 Indented outline format

 6.3 Work breakdown structure functions

 6.4 Work breakdown structure specifications

 6.5 Techniques for WBS development

 6.6 Scope of work based on the work breakdown structure

 6.7 Risk management considerations 

Chapter 7 Diagramming/Scheduling

 7.1 What is so difficult about scheduling

 7.2 Schedule definition

 7.3 Project time management

 7.3.1 Activity sequencing

 7.3.2 Duration estimating

 7.3.3 Schedule development

 7.3.4 Time control

 7.4 Method of developing an optimum schedule for an accelerated project 

Chapter 8 Cost Estimating

 8.1 Project cost management

 8.2 Cost classification

 8.2.1 Direct cost

 8.2.2 Indirect cost

 8.3 Types of cost estimates

 8.4 Information required for assigning resources/cost estimating

 8.5 Impact of resource assignment on duration estimating

 8.6 General process for assigning resources/cost estimating

 8.7 Contingency estimating on lump sum contracts 

Chapter 9 Earned Value Analysis

 9.1 Earned value analysis

 9.2 Definition of terms

 9.3 Variance calculations

 9.4 Graphical earned value analysis

 9.5 Cost and schedule forecasting

 9.5.1 Calculation of estimate at completion

 9.5.2 Calculation of estimated duration at completion

 9.6 Causes of project variance 

Chapter 10 Advanced Project Planning and Risk Management

 10.1 Understanding quantitative decision analysis

 10.2 Structuring the decision problem

 10.2.1 Decision tree

 10.2.2 Influence diagrams 

Chapter 11 Remedial Investigation/Feasibility Study (RI/FS)

 11.1 Scoping

 11.2 Site characterization

 11.2.1 Define site physical characteristics

 11.2.2 Characterize sources of contamination

 11.2.3 Characterize nature and extent of contamination

 11.2.4 Perform data analysis

 11.2.5 Define contaminant fate and transport

 11.2.6 Define contaminant-and location-specific requirements

 11.2.7 Evaluate additional data needs

 11.2.8 Preliminary site characterization summary

 11.3 Development and screening of alternatives

 11.4 Treat-ability studies

 11.4.1 Level of treat-ability studies

 11.4.2 Suggested content for a pilot-scale treat-ability study work plan

 11.4.3 Determining the need for treat-ability studies

 11.4.4 Timing of treat-ability studies

 11.4.5 Treat-ability study goals