统一过程精解(影印版)

统一过程精解(影印版)
作 者: Kendall Scott
出版社: 清华大学出版社
丛编项: 软件工程实践丛书
版权说明: 本书为公共版权或经版权方授权,请支持正版图书
标 签: 暂缺
ISBN 出版时间 包装 开本 页数 字数
未知 暂无 暂无 未知 0 暂无

作者简介

  the designations have been printed with initial capital letters or in all cpitals. The author and publisher have taken care in the preparation of this book

内容简介

Many of the designations used by manufacturers and sellers to distinguish theri products are claimed as trademarks. Where those designatioins appear in this book, and Addison-Wesley was aware of a trademark claim, the designations have been printed with initial capital letters or in all cpitals.The author and publisher have taken care in the preparation of this book, but make no expressed or implied warranty of any kind and assume no responsibility for errors or omissions. No liability is assumed for incidental or consequential damages in connection with osr arising out of the use of the information or programs contained herein.

图书目录

List of Figures

Preface

Why This Book?

Organization of This Book

Acknowledgments

Chapter 1:Overview

Introduction

History

Use Case Driven

Architecture-Centric

Understanding the Big Picture

Organizing the Development Effort

Facilitating the Possibilities for Reuse

Evolving the System

Guiding the Use Cases

Iterative and Incremental

Logical Progress Toward a Robust Architecture

Dealing With Ongoing Changes in Requirements

Greater Flexibility to Change the Plan

Continuous Integration

Early Understanding

Ongoing Focus on Risk

The Four Phases

Inception

Elaboration

Construction

Transition

The Five Workflows

Requirements

Analysis

Design

Implementation

Test

Iteration and Increments

Artifacts,Workers,and Activities

Artifacts

Workers

Activities

Chapter 2:The Requirements Workflow

Introduction

Reach Agreement on the System Context

List Candidate Requirements

Identify and Negotiate Functional Requirements

Specify Nonfunctional Requirements

Artifacts

Domain Model

Business Model

Glossary

Actor

Use Case

User-Interface Prototype

Use Case Model

Architecture Description(View of the Use Case Model)

Supplementary Requirements

Workers

System Analyst

Use Case Specifier

User-Interface Designer

Architect

Activities

Build the Domain Model

Build the Business Model

Find Actors and Use Cases

Prototype the User Interface

Prioritize the Use Cases

Detail a Use Case

Structure the Use Case Model

Chapter 3:The Analysis Workflow

Introduction

Artifacts

Analysis Class

Use Case Realization-Analysis

Analysis Package

Analysis Model

Architecture Description(View of the Analysis Model)

Workers

Architect

Use Case Engineer

Component Engineer

Activities

Perform Architectural Analysis

Analyze a Use Case

Analyze a Class

Analyze a Package

Chapter 4 The Design Workflow

Introduction

Artifacts

Design Class

Use Case Realization-Design

Interface

Design Subsystem

Design Model

Architecture Description(View of the Design Model)

Deployment Model

Architecture Description(View of the Deployment Model)

Workers

Architect

Use Case Engineer

Component Engineer

Activities

Perform Architectural Design

Design a Use Case

Design a Class

Design a Subsystem

Chapter 5:The Implementation Workflow

Introduction

Artifacts

Component

Interface

Implementation Subsystem

Implementation Model

Architecture Description (View of the Implementation Model)

Integration Build Plan

Workers

Architect

Component Engineer

System Integrator

Activities

Perform Architectural Implementation

Implement a Class

Perform Unit Test

Implement a Subsystem

Integrate the System

Chapter 6:The Test Workflow

Introduction

Artifacts

Test Case

Test Procedure

Test Component

Test Model

Test Plan

Defect

Test Evaluation

Workers

Test Engineer

Component Engineer

Integration Tester

System Tester

Activities

Plan Test

Design Test

Implement Test

Perform Integration Test

Perform System Test

Evaluate Test

Chapter 7:The Inception Phase

Introduction

Getting Started

Plan the Inception Phase

Expand the System Vision

Establish the Evaluation Criteria

Requirements Activities

Build the Domain Model

Build the Business Model

Find Actors and Use Cases

Prioritize the Sue Cases

Detail a Use Case

Analysis Activities

Perform Architectural Analysis

Analyze a Use Case

Design Activities

Perform Architectural Design

Taking Stock

Assess Each Iteration

Assess the Phase as a Whole

Looking Ahead

Make the Initial Business Case

Do Initial Planning for the Elaboration Phase

Chapter 8:The Elaboration Phase

Introduction

Getting Started

Plan the Elaboration Phase

Establish the Evaluation Criteria

Requirements Activities

Build the Domain Model

Build the Business Model

Find Actors and Use Cases

Prototype the User Interface

Prioritize the Use Cases

Detail a Use Case

Structure the Use Case Model

Analysis Activities

Perform Architectural Analysis

Analyze a Use Case

Analyze a Class

Analyze a Package

Design Activities

Perform Architectural Design

Design a Use Case

Design a Class

Design a Subsystem

Implementation Activities

Perform Architectural Implementation

Implement a Class

Perform Unit Test

Implement a Subsystem

Integrate the System

Test Activities

Plan Test

Design Test

Implement Test

Perform Integration Test

Perform System Test

Evaluate Test

Taking Stock

Assess Each Iteration

Assess the Phase as a Whole

Looking Ahead

Make the Full Business Case

Do Initial Planning for the Construction Phase

Chapter 9:The Construction Phase

Introduction

Getting Started

Plan the Construction Phase

Establish the Evaluation Criteria

Requirements Activities

Find Actors and Use Cases

Prototype the User Interface

Prioritize the Use Cases

Detail a Use Case

Structure the Use Case Model

Analysis Activities

Perform Architectural Analysis

Analyze a Use Case

Analyze a Class

Analyze a Package

Design Activities

Perform Architectural Design

Design a Use Case

Design a Class

Design a Subsystem

Implementation Activities

Implement a Class

Perform Unit Test

Implement a Subsystem

Integrate the System

Test Activities

Plan Test

Design Test

Implement Test

Perform Integration Test

Perform System Test

Evaluate Test

Taking Stock

Assess Each Iteration

Assess the Phase as a Whole

Looking Ahead

Do Initial Planning for the Transition Phase

Chapter 10:The Transition Phase

Introduction

Getting Started

Plan the Transition Phase

Establish the Evaluation Criteria

Activities

Get the Beta Release Out

Install the Beta Release

Respond to Test Results

Adapt the Product to Varied User Environments

Complete the Artifacts

Taking Stock

Assess Each Iteration

Assess the Phase as a Whole

Looking Ahead

Complete the Business Case

Do a Postmortem for the Project

Plan the Next Release or Generation

Appendix A: The Rational Unified Process

Workflows

Project Management

Business Modeling

Requirements

Analysis and Design

Implementation

Test

Configuration and Change Management

Environment

Deployment

Artifact Sets

Workers

Appendix B:Extreme Programming and the RUP

A High-Level View of XP

Values

Fundamental Principles

Development Practices

XP and the RUP:Common Ground

XP and the RUP:Key Differences

So,Is XP and Instance of the RUP Or Not?

Appendix C:The ICONIX Process

Bibliography

Glossary

Index