| 作 者: | 中国铁路总公司 编 |
| 出版社: | 中国铁道出版社 |
| 丛编项: | |
| 版权说明: | 本书为出版图书,暂不支持在线阅读,请支持正版图书 |
| 标 签: | 暂缺 |
| ISBN | 出版时间 | 包装 | 开本 | 页数 | 字数 |
|---|---|---|---|---|---|
| 未知 | 暂无 | 暂无 | 未知 | 0 | 暂无 |
1 General Provisions
2 Terms
3 Basic Requirements
3.1 General Requirements
3.2 Content and Process of Risk Management
3.3 Risk Classification
3.4 Risk Level
3.5 AcceptableRiskCriteria
3.6 Risk Plan
3.7 Risk Identification
3.8 Risk Estimation
3.9 Risk Evaluation
3.10 Risk Control
3.11 Risk Assessment after Project Completion
3.12 Risk Management by All Parties Involved
4 Risk Management in Feasibility Study Phase
4.1 General Requirements
4.2 Content and Process of Risk Management
4.3 Typical Hazard Factors
4.4 Key Technical Points in Risk Management
5 Risk Management in Preliminary Design Phase
5.1 General Requirements
5.2 Content and Process of Risk Management
5.3 Typical Hazard Factors
5.4 Key Technical Points in Risk Management
6 Risk Management in Construction Document Design Phase
6.1 General Requirements
6.2 Content and Process of Risk Management
6.3 Typical Hazard Factors
6.4 Key Technical Points in Risk Management
7 Risk Management in Construction Phase
7.1 General Requirements
7.2 Content and Process of Risk Management
7.3 TypicalHazard Factors
7.4 Key Technical Points in Risk Management
8 Preparation of Risk Management Report
Appendix A Record Table of Risk Management
Explanation of Wording in this Code