| 作 者: | 贾洛特 |
| 出版社: | 高等教育出版社 |
| 丛编项: | 国外优秀信息科学与技术系列教学用书 |
| 版权说明: | 本书为出版图书,暂不支持在线阅读,请支持正版图书 |
| 标 签: | 软件过程 |
| ISBN | 出版时间 | 包装 | 开本 | 页数 | 字数 |
|---|---|---|---|---|---|
| 未知 | 暂无 | 暂无 | 未知 | 0 | 暂无 |
Preface Xi
Acknowledgments XV
1 Introduction
1.1 Process-Based Approach for Project Execution
1.2 Capability Maturity Model for Software
1.3 Processes at Infosys
1.4 Summary
Part I Project Initiation
2 Proposals and Contracts
2.1 Customer and Vendor Interaction
2.2 The Proposal
2.5 The Contract
2.4 Summary
3 Requirements Specification and Ma
3.1 Requirements Analysis and Specification
3.2 Requirements Change Management
3.3 Traceability Management
3.4 Example: The WAR System
3.5 Summary
Part II Project Planning
4 Process Definition and Tailoring
4.1 Development Process
4.2 Process Tailoring
4.9 Summary
5 Process Database and Process Capability Baseline
5.1 Software Metrics and Process Management
5.2 Process Database
5.a Process Capability Baseline
5.4 Summary
6 Effort Estimation and Scheduling
6.1 Background
6.2 Bottom-Up Estimation
6.3 Top-Down Estimation
6.4 Scheduling
6.5 Summary
7 Quality Planning and Defect Estimation
7.1 Quality Management
7.2 Quantitative Quality Management Planning
7.3 Summary
8 Risk Management
8.1 Background
8.2 Risk Assessment
8.3 Risk Control
8.4 Examples
8.5 Summary
9 Project Management Plan
9.1 Project Management Plan
9.2 Example: Project Plan of WAR 2.0
9.3 Summary
10 Configuration Management
10.1 Configuration Management Concepts
10.2 Configuration Management Process
10.3 Document Control
10.4 Example: Configuration Management Plan of the WAR Project
10.5 Summary
Part III Project Execution and Termination
11 Life Cycle Execution
11.1 High-Level Design
11.2 Detailed Design
11.3 Build
11.4 System Testing
11.5 Acceptance and Installation
11.6 Summary
12 Peer Review
12.1 Review Process
12.2 Data Collection
12.3 Monitoring and Control
12.4 Introduction of Reviews and the NAH Syndrome
12.5 Summary
13 Project Monitoring and Control
13.1 Data Collection
13.2 Project Tracking
13.3 Quantitative Monitoring and Control
13.4 Defect Analysis and Prevention
13.5 Summary
14 Project Audits
14.1 Audit Process
14.2 Audit Analysis
14.3 Summary
15 Project Closure
15.1 Project Closure Analysis
15.2 Archiving
15.3 Closure Analysis Report for WAR 2.0
15.4 Summary
Appendix A: From ISO 9000 to CMM
Appendix B: Managing the software Process
Improvement Project
Index